Dallas, Ga Bathroom Remodel 

WHAT

Bathroom Update

When this remodel started out the client had a old large garden tub that was cracked and needed to be updated. So i cut the old one out, removed the old toilet, stripped the floors of the old linoleum, removed the old quarter round. 

 

The old bathtub was a center drain and was quite a bit larger than the new four piece combo shower that was needing to be installed so, the plumbing had to be moved to a left hand drain and all the water lines moved over to line up in the center of the new bathtub.  

After installing the new bathtub, I sheetrocked around the new tub and finished it to a smooth finish. Then there was a new stone tile design linoleum installed with all new quarter round. Then the bathroom was painted and the new toilet installed to finish off this bathroom.

WHERE

Dallas, Ga

WHEN

October 2019

20191005_214255.jpg
20191005_214337.jpg
20191005_214345.jpg
20191024_100903.jpg
20191024_104040_HDR.jpg
20191024_184424.jpg
20191027_175728.jpg
20191027_175742.jpg
20191028_160538.jpg
20191029_130306.jpg
20191031_153702.jpg
20191105_162727.jpg
20191105_162735.jpg
20191105_181256.jpg
20191125_190450.jpg
20191125_190441.jpg
BE IN 
TOUCH

BKW Handyworks, LLC

  • White Facebook Icon
  • White Twitter Icon
  • White Instagram Icon
bottom of page