Dallas, Ga Bathroom Remodel
WHAT
Bathroom Update
When this remodel started out the client had a old large garden tub that was cracked and needed to be updated. So i cut the old one out, removed the old toilet, stripped the floors of the old linoleum, removed the old quarter round.
The old bathtub was a center drain and was quite a bit larger than the new four piece combo shower that was needing to be installed so, the plumbing had to be moved to a left hand drain and all the water lines moved over to line up in the center of the new bathtub.
After installing the new bathtub, I sheetrocked around the new tub and finished it to a smooth finish. Then there was a new stone tile design linoleum installed with all new quarter round. Then the bathroom was painted and the new toilet installed to finish off this bathroom.
WHERE
Dallas, Ga
WHEN
October 2019